Module Progress
The first scene is the Carpentry Shop. They manufacture tables and chairs. The roofs are removable and so I plan to detain the inside with machinery and manufacturing stuff. Lots of garbage outside and maybe a wagon bringing in new wood.
Here is the warehouse and tool shed in place on the passing siding.
The ballast was made from crushed granite sifted to scale size.
Sift your dirt with pantihose. It makes all the difference.
Here you can see Duluth's installed just down the track from the warehouse. These are all Sierra West Kits.
Looking the other way the truck repair facility will go in way down in the end.
The roads have some acrylic modelling paste added to the dirt and paint to maintain flexibility and prevent cracking.
0 Comments:
Post a Comment
<< Home